This North Reading home had an aging and inefficient heated floor piping system that needed a complete overhaul. The original hydronic piping was outdated, prone to leaks, and no longer delivering consistent heat.
The Just Right Services team performed a full demolition of the old piping, removed failing components, and installed a completely re-piped heated floor system designed for better performance, reliability, and even heat distribution. The project also included a boiler repipe to ensure the upgraded system operated safely and efficiently.
The final installation features clean, organized piping, modern controls, and a streamlined mechanical layout, a dramatic improvement from the original setup. This project showcases Just Right Services’ ability to transform complex mechanical rooms into high-performing, long-lasting systems built with precision craftsmanship.