See the Snow Melt System in Action
During the February 2026 nor’easter that brought over 20 inches of snow to the Greater Boston area, this Lexington snow melt system was put to the test and performed exactly as designed.
While surrounding properties required constant shoveling and snow removal, this system automatically activated to keep the driveway and walkways clear, safe, and accessible throughout the storm.
This real-world performance highlights the reliability of a properly designed hydronic snow melt system powered by a Viessmann boiler, Tekmar controls, and high-efficiency circulation components.